14 Bridges - Niemba (DRC)

Pontsnyemba-1122x862
Studies for a 136m long bridge over the Niemba River. Our work involved calculating the dimensions for the abutments, the pillars and the deck based on soil tests carried out on-site and taking into account the traffic loads from the Eurocode. The bridge is built on foundation pits embedded in the r ...Read more



Construction of 14 bridges

PRODUCT_DATASHEET

MAITREDOUVRAGE : EGMF

ARCHITECTE :

LIEUDEXECUTION : Nyemba (RDC)

MONTANTDESTRAVAUX :

ETATDAVENCEMENT : Studies and work underway

DATEDERECEPTION :

TYPEDEMARCHE : Private

  • Description
Studies for a 136m long bridge over the Niemba River. Our work involved calculating the dimensions for the abutments, the pillars and the deck based on soil tests carried out on-site and taking into account the traffic loads from the Eurocode. The bridge is built on foundation pits embedded in the rock. Studies for 13 bridges up to 12m long, as well as 4 culverts as part of the project to upgrade the road from Kalemie to Niemba. Our work involved calculating the dimensions for the abutments, the metal girders and the deck of the bridges. These bridges are built on baseplates in good soil.